I drew this set sketch back in February of this year. The set installation last week was a bit epic so I thought it deserved it's own documentation. Gemma Brooks masterminded the scaffolding structure that was then to be clad in beautiful knotty wood to create our rustic spanish villa.
|
Scaffolding is erected and the balcony floor is laid... |
|
...flats and doors installed... |
|
...venetian blinds installed... |
|
...Carpet goes down... |
|
...props and furniture set... |
|
...set dressing and lighting... |
Once our set was up and ready to go, the cast arrived and began to rehearse in the space. Paul Blakemore took some stunning production shots which are a few posts down on the blog.